batshonnicole
batshonnicole batshonnicole
  • 02-01-2019
  • Mathematics
contestada

Six people paint the fence and 15 hours how long would it take five workers to do the same job

Respuesta :

somaiasult2006
somaiasult2006 somaiasult2006
  • 02-01-2019
it will take 12.5 hrs for five workers to do the same job.


steps:

15 × 5 = 75

75 ÷ 6 = 12.5
Answer Link

Otras preguntas

solve -5 3/4-3 1/2+ I solved it so imma just help out
The majority of dependencies that remain today are located in Africa. part of the British empire. under independent control. under authoritarian control. locate
Find the area of the shaded religion. Giving brainliest! <3
What are the 12 steps of the Hero’s Journey in the book The Adoration of Jenna Fox?
Lines DE and AB intersect at point What is the value of x?C. O 12 25 А. |(2x + 2)E 38 С (5x + 3) 52 D B I’m sorry if doesn’t make sense but there’s the picture!
I need answer ASAP! Will give Brainliest if the answer is correct! A square pyramid and its net are shown below. What is the surface area of the pyramid?
Whats -606-(-778+20)+2n?
which word is capitalized? A)Mother B)Father C)president D)I
9 Find the height of the parallelogram (A = bh) * (1 Point) A = 60 cm2 5 cm h = 8 cm h= 12 cm H= 10 cm H= 300 cm
If a 50 W light bulb and a 90 W light bulb operate from 120 V, which bulb has a greater current in it? 50 W 90 W