lillymcginn lillymcginn
  • 02-11-2019
  • Mathematics
contestada

A lift that weighs 300N moves a man with a weight of 950N upwards by 12m. How much work is done to move the lift this height?

Respuesta :

skyluke89
skyluke89 skyluke89
  • 07-11-2019

Answer:

15,000 J

Step-by-step explanation:

Since the lift also carries the man, the total weight of the man+lift system is

[tex]F=300 N + 950 N = 1250 N[/tex]

The work done in moving the lift upward is

[tex]W=Fd[/tex]

where

F is the weight of the lift+man combined system

d is the displacement

In this problem,

F = 1250 N

d = 12 m

Substituting,

[tex]W=(1250)(12)=15,000 J[/tex]

Answer Link

Otras preguntas

What is the difference between fish, amphibians, and reptiles? How to classify each.
Studies of the congressional agenda demonstrate that it is characterized by
can anyone please factor this v^3+27
Which of the following setups would convert centimeters to feet?
Find the point-slope form of the equation of the line passing through the points (–1, –3) and (4, 1).
From examples 9 and​ 10, what is the connection between function notation to evaluate a function at certain values and ordered pair solutions of the​ function?
riddle me this I'm thinking of a number it is odd is between 1 and 100 is higher than 20 it is smaller than the answer to 6 times 6 it is a multiple of 5 the su
Find the surface area of the sphere to the nearest square unit. Use a calculator. A. 13 in.2 B. 50 in.2 C. 6 in.2 D. 3 in.2
Is America a land of liberty ? Why?
Which best describes the first two years of the revolutionary war