60% of the work is done in 17 minutes, 40% of the same work, when is done (in minutes)?

Respuesta :

bridgecostello bridgecostello
  • 02-12-2019

Answer:

It would be 11.333 minutes

Step-by-step explanation:

I solved this by setting up a cross multiplication.

60%/17 so then 40/x.

Then here cross multiplying. 60x=680. divide by 60 and x would = 11.33

Answer Link

Otras preguntas

What are two main differences between Titans and Olympian Gods?A. Most Titans represented evil; most Olympian Gods represented goodB.Olympian Gods were second g
help please :) acellus
Which best explains at which restaurant the average meal costs the most money? Restaurant 1, because the interquartile range of Restaurant 1 is greater Restaur
I will give you all five stars ⭐⭐⭐⭐⭐
Why might someone use terrorism to bring change
What was the “Great Compromise” in drafting the new constitution?
A machine that costs Tsh 180000 was sold at a profit of 40% Find the selling price ​
what is the 15th n term of the sequence 22 18 14 10 6
Mia is making a necklace using two types of beads. Buying 40 blue beads and 20 silver beads will cost $10. Buying 20 blue beads and 40 silver beads will cost
Simplify (1/2k) (4k) + 12 2k 2 + 12 14k 2 2k + 12 14k