katriceervin12p8wls8 katriceervin12p8wls8
  • 02-05-2020
  • Mathematics
contestada

If it takes 12 weeks for the factory to be at full capacity, how many weeks would it take for the factory to be at half capacity?

Respuesta :

jam2282
jam2282 jam2282
  • 02-05-2020

Answer:

it takes 6 weeks fir the factory to be at half capacity

Step-by-step explanation:

half of 12 is 6

Answer Link
jojiwalt
jojiwalt jojiwalt
  • 02-05-2020

It would take 6 weeks to be at half capacity

Answer Link

Otras preguntas

How are the words such as first although in there for used? A. As prepositions B. As transitions C. As conclusions D. As support
what volume of a 1.0 m hcl is required to completely neutralize 25.0 ml of a 1.0 m koh?
Difference between diary keeping and record keeping
if log65 = 1.812 what is the value of log(base 1000)65 ? 0.0604 0.604 0.1812 0.001812
Find the slope of the line whose equation is 8y = 2x + 4
Which of the following is the best example of a check on presidential power? A. the Supreme Court finding a law unconstitutional B. the Senate voting to pass a
the order in which atomic orbitals are filled is based on what factor?
when a sentence begins with two prepositonal phrases joined by word and, where should the writer place a comma?
many tourists visit california’s death valley national park motivated by curiosity to see a geological phenomenon known as the sailing stones or moving rocks. t
which statement is true about the graphs of the two lines y=-4/5xt2 and y=-5/4x-1/2?