adoflotorres adoflotorres
  • 03-07-2020
  • Computers and Technology
contestada

Which field can be used to track the progress on tasks that a user has created?
Subject
Start Date
Due Date
% Complete

Respuesta :

connerb333 connerb333
  • 08-07-2020
All of these are correct and what Would work best is a % Complete_ at what this would do is show a 0-100 completion rate
Answer Link
babyyyjadee babyyyjadee
  • 30-10-2020
All of them would work but the most efficient one would be % complete
Answer Link

Otras preguntas

Your teacher asked your class to describe a real world situation in witch a y-intercept is 100 and the slope is 5. Your partner gave the following description:
Light is released when an excited electron moves from higher energy level back down to its lower, more stable energy level. The resulting spectrum is a(n) _____
Why do cells divide?
What do fast-food companies most likely hope gain by advertising and selling their products in schools?
How do I solve this???
Which characteristic of transcendentalism is exemplified from the essay self reliance
How does Raquel feel about her English lesson?
The formula relates the time, T, in seconds for a pendulum with the length, L, in feet, to make one full swing back and forth. What is the length of a pendulum
What is the square root of 100 times two divided by two
who won the battle of fort crown point a. the americans b. the british