A construction company delivered 40 loads of concrete in 5 days.

What was their rate of work?



A.




B.




C.




D.


Respuesta :

melhunt99
melhunt99 melhunt99
  • 05-11-2016
Well 40 divided by 5 is 8 and you don't have options so I would say 8 loads a day :)
Answer Link

Otras preguntas

Does anyone know this and can help me I’m marking brilliant
Students create a standing wave with three loops on a slinky 3.75 m longThey time 20 oscillations in 6.73 . What frequency would create a standing wave with 5 l
When you open a switch in an electric circuit you are creating a gap and stopping the flow of electrons. O True O False
In a story, two siblings who do not get along well must band together for comfort when their mother marries a man they do not like. Which two literary themes mo
Choose the correct answer below. A. aless than7 B. agreater than7 C. aminus7 D. anot equals6 E. aequalsnegative 7 F. aless than or equals7 G. aless than or equa
Dave made 12 free throws out of 15 attempts. What is his free throw average as a decimal
Mike put 400 baseballs into 10 trash bins. He put the same number of baseballs in each bin. He took 5 trash bins of baseballs to the baseball field. How many ba
Lines m and n are parallel lines. If line m has a slope of -1, find the slope of line n. Type a numerical answer in the space provided. If necessary, use the /
All of the following were early uses of oil EXCEPT:
Firelight Company manufactures candles. The standard direct materials quantity required to produce one large candle is one pound at a cost of $5 per pound. Duri