victorharrell2003
victorharrell2003 victorharrell2003
  • 01-05-2021
  • Computers and Technology
contestada

PLEEASE ANWER QUICK: The project manager is writing the requirements document. Which phase of the project life cycle is he in?
project closure
project planning
project initiation
project execution ​

Respuesta :

Animmango
Animmango Animmango
  • 01-05-2021

Answer:

I think, project execution. He is writing the requirements document. which mean it doesn't project closure and initiation. then he did it which mean it doesn't project planning.

Answer Link

Otras preguntas

Let σ(n) be the sum of all positive divisors of the integer n and let p be any prime number. Show that σ(n) < 2n holds true for all n of the form n = p²
Which condition would increase the likelihood of an animal's remains being fossilized?
Acc 450 the date of the management representation letter should coincide with the:_____.
Use the figure to the right to find the value of PT. T is the midpoint of PQ PT=3x+3 TQ=7x-9
Assume that adults have iq scores that are normally distributed with a mean of μ=100 and a standard deviation σ=15. find the probability that a randomly selecte
1. Derive the half-angle formulas from the double angle formulas. 2. Provide the formulas to convert between polar and rectangular forms. 3. Convert one point f
Within a eukaryotic genome, where would you not expect to find nucleosome-free regions?
List five ways to incorporate safety while being active and tell why each is important.
People ignoring credible warnings about terrorist attacks due to the massive amounts of coverage in the aftermath of september 11, 2001, is an example of?
How wide in m is a single slit that produces its first minimum for 631-nm light at an angle of 12. 0°? m