Mr. Kumar is getting his house renovated. 1/5 th of the work has been completed in 2 months. How much time will it take for the entire work to be completed?

Respuesta :

liam2747
liam2747 liam2747
  • 02-05-2021

Answer:

10 months

Step-by-step explanation:

If it takes 2 months to do 1/5th, it will take 4 months to do 2/5, 6 months to do 3/5, 8 months to do 4/5, and 10 months to do 5/5 or in other words the whole thing.

Answer Link

Otras preguntas

Which of the following accurately characterizes the process of melting? Because energy is released, melting is an endothermic process Because energy is absorbe
Does a wizard function allow the user to enter or modify data in the records? select yes or no
Nosotros____30 años. tienen tengo tenemos tiene
A company has a fiscal year-end of december 31: (1) on october 1, $12,000 was paid for a one-year fire insurance policy; (2) on june 30 the company lent its chi
If there is an 80% chance of rain and a 50% chance of wind and rain, what is the probability that it is windy, given that it is rainy? Round your answer to the
Can a ratio be expressed as a percentage
Regions of the body where protein is vital
Which event served as a signal to the jews in germany and austria to leave as soon as possible?
Which of the following is an example of what a conclusion should NOT do? Restate the new idea Introduce a new idea Summarize key points "Wrap up" the compositi
What is the maximum number of electrons that the d-orbitals can hold?