MaThWiZz6123 MaThWiZz6123
  • 02-07-2021
  • Mathematics
contestada

It take 4 people 40 minutes to clean a garden. How long will it take 6 people to clean the same garden

Respuesta :

loconte loconte
  • 02-07-2021

Answer:

4/9 of an hour (26.666 minutes)

Step-by-step explanation:

4 * x * 40/60 = 1

x * 160/60 = 1

x=60/160 = 6/16 = 3/8 (this is the rate for one worker)

~~~~~~~~~~~~~~~~

6 * (3/8) * x = 1

x = 4/9

Answer Link

Otras preguntas

A prairie dog left its burrow 5 feet underground and started digging deeper into the ground. It digs straight down at a constant rate of 2 feet per minute. How
Identify the turning point (major historical event) that caused the change seen in this chart.
What is the area of this figure
I need help.. 1. 4(7p+8) 2.-7(2+8s) 3.-8(-6d+3)
At a party, 5 people are sharing 1/2 of a pizza. What equal size portion does each person get? Please explain
Apolinaria Lorenzana's life and work reveal how women helped build San Diego. She A) cared for the padres, tended the sick, and taught children. B) taught India
At the fall festival, a booth is selling $5 meals and $10 meals. They sell 1000 meals in all and collect $3500. Which system of equations could represent the m
Question 2 5 pts Which of the following is intended to complete the sale after other promotional types have attracted the customer to the product? O Public rela
Can anyone help me with my homework
Identify the sphere where life first emerged on Earth.