ginapogones6676 ginapogones6676
  • 02-07-2021
  • Business
contestada

A costing system that uses actual costs for direct materials and labor and predetermined overhead rates to apply overhead is called a(n)

Respuesta :

topeadeniran2 topeadeniran2
  • 07-07-2021

Answer: normal costing system

Explanation:

A costing system which uses the actual costs for direct materials and the labor and predetermined overhead rates to apply overhead is referred to as the normal costing system.

Normal costing system is the cost allocation method whereby cost is assigned to products which are based on the labor, materials, and the overhead which are used in their production.

Answer Link

Otras preguntas

How many atoms in all are in one molecule of ferric sulfide? 2 6 7 5 formula : Fe2S3
Where did Zachary Taylor station his troops?
Does the physical form of the material matter for mass-mole and mole-mass calculations?
Write an informational text on any topicMust include:IntroductionThesis statementbody paragraphconclusionTotal of three paragraphsBEST ANSWER GETS BRAINLIEST
_____ 's years idiom​
Help me anyone pleaseeee
Please I need an answer ASAP!!!!!!!!!!
Write an essay about:Do you support the impact theory which explains the extinction of dinasaurs and other species of animals and plants 65 million years ago?​
put in a cool picture
sum of exactly two terms that is equivalent to 3(6x + 9y).