The top-down method of estimating project time and costs that is useful for projects requiring the same task, group of tasks, or product repeated several times, especially if it is labor intensive, is the ______________.
a) function point
b) ratio
c) apportion
d) consensus
e) learning curves

Respuesta :

parisannthornton parisannthornton
  • 04-08-2021
The answer is e) learning curves
Answer Link

Otras preguntas

Read through the passage, and decide whether each sentence is written in a parallel structure. If not, correct the sentence with a choice from the drop-down men
can you post pics when you are anwsering
What is one effect of World War One on the black community according to Howard Johnson
One major reason the League of Nations failed was that it
How do you calculate this
ideas that are outlined in the Enlightenment?
Economic sector that deals with the extraction of raw materials from the environment.
When sugar is dissolved in water the resulting solution is classified as a?
What is meant by the expression b1/3?
PLEASE HELP The main purpose of "Swarms of Terror" is to ____________, whereas the main purpose of "Growing Up on a Farm" is to ______________. explain how the