krishnashrrstha41
krishnashrrstha41 krishnashrrstha41
  • 04-08-2021
  • Mathematics
contestada

15men can complete a piece of work in25days. how many men should be added to complete the same work in15days.​

Respuesta :

mhanifa
mhanifa mhanifa
  • 04-08-2021

Answer:

  • 10 men

Step-by-step explanation:

Amount of work done by 15 men is:

  • 15 men *25 day = 15*25 man*days

Same work can be done by 25 men, in 15 days, so 10 more men should be added.

Answer Link
abovejosh
abovejosh abovejosh
  • 04-08-2021
Answer: 10 men explanation: guy above me
Answer Link

Otras preguntas

A line passes through the points (1, 4) and (3,-4). Which is the equation of the line? O y=-4x+8 O y=-2x + 6 O y=-1/4x+2 O y = 2x + 2
Can someone help me with this question plz?
Why was the Marquis de Lafayette called “the Hero of Two Worlds”?
what did France do during the triple entente
True Or False: Jean-Jacuese rousseau believed that the government should have all power and influence of the citizens.
Solve the equation X/-2=5
What do you mean by life process?​
Who could best help address a dangerous situation at school? friend principal hall monitor peer mediator
Simplify completely (x+1/1-x)(x+2/x^2)
Which situation is represented by the equation 100 + 40x = 50x? A. Gym A charges $40 per month plus an initial fee of $100. Gym B charges $50 per month. When