veevek826 veevek826
  • 15-08-2021
  • Social Studies
contestada

what should be done to complete on going development projects in nepal​

Respuesta :

dulalunisha2
dulalunisha2 dulalunisha2
  • 15-08-2021

Answer:

First of all, to complete the project on time, the government should be very careful and clever to its supervision. Those company and person who has taken all the responsibility of construction of the projects; he must should be active and energetic to complete their projects on the right given of time.

On the other hand, the core supervision by the government and responsible authority should be done time to time so they will have pressure to ending their projects on specific time frame.

Have a great day

Answer Link

Otras preguntas

________ can vary from culture to culture and are socially acceptable ways of showing emotion in public settings.
What effect did the phoenicians have on the world
Which of the following statements about Zeus is FALSE?
why is studying supply and demand useful?
The Australian dragonfly can travel 18 miles in 30 minutes how far can the dragonfly travel in 1 minute
solve for x without a calculator. ln(x) + ln(x − 1) = 1
What is the sum of 5/6 and 2/3
Which of the following is not a purpose of a conclusion paragraph? to give a finished feeling to your paper to tell your reader everything that she read to summ
The _____ quality attributes are embedded in the total product, that is, the physical or core product and all the additional features the consumer expects.
Which of the following is not a feature of most good mood melodies