hannahgrace31511 hannahgrace31511
  • 03-11-2021
  • Mathematics
contestada

A chef can finish a catering job in 4hr. His student can do the same job in 12hr. How long will it take them both to do the job if they work together

Respuesta :

shayy1616 shayy1616
  • 03-11-2021
12 divided by 4 equal 3
Ans:3hrs
Answer Link

Otras preguntas

please help me i really need help please
Over the past 20 years, Eastern Europe has transitioned to a _________ economy.
Which of the following is not a form of precipitation? VOCAB GAME A groundwater READ & RESPOND B balls of hail sleet LYRIC LAB snowflakes
reflection: make a statement of assertion about the activity that reflects your most valued learning​
This one is really hard for me can someone please help!
Mason opens a savings account by making a $165.85 deposit. Every week, he deposits another $20.50 in the account. The following expression shows the amount of m
In ΔKLM, the measure of ∠M=90°, the measure of ∠K=68°, and MK = 42 feet. Find the length of LM to the nearest tenth of a foot.
I am giving a easy work easy to the person who need brainllest! the correct answer bye Now !
BRAINLIEST 1. How did the war production board support the war effort? 2. What was the purpose of rationing and victory gardens? 3. What was the "Double V" cam
What does the point (2, 12) represent?