If 24 electricians can wire some new houses in 15 days, how many electricians would be required to do the job in 12 days?.

Respuesta :

shishirshrestha989
shishirshrestha989 shishirshrestha989
  • 04-01-2022

Answer:

here,

electrician/days

24 - 15

x(let). -12

direct proportion,

then,

exchange X up 24 down

or,24*15=12*X

or,24*15divided by 12=X

X=30

hence,30 electrician required to do complete in 12 days

Answer Link

Otras preguntas

What is the Difference between Research and Investigation???
Which type of twins are likely to interact with each other in the womb a. Non-identical b. Identical c. neither
Patrick ate 3/5 of a small pizza on Friday night. For lunch on Saturday , he ate 1/2 of the leftover pizza. How much pizza did he eat for lunch on Saturday?
If y=2 when x=3. What is the value of y when x=9?
Patrick ate 3/5 of a small pizza on Friday night. For lunch on Saturday , he ate 1/2 of the leftover pizza. How much pizza did he eat for lunch on Saturday?
pythagorean theorem If l = 12 cm and m = 35 cm, what is the length of n?
What causes chemical weathering?
who decided the election of 1800 and why ?
Show that 9x^2-17x-85=0 give you solutions to 3 correct significant figures There are two possible answers for x
Show that 9x^2-17x-85=0 give you solutions to 3 correct significant figures There are two possible answers for x