ahmaduae629 ahmaduae629
  • 13-05-2022
  • Physics
contestada

Ahmad pulls a sled across level snow by 75 N . If the sled moves 15 m , how much work does Ahmad do on the sled?

Respuesta :

ancyvarghese ancyvarghese
  • 13-05-2022

Answer:

1125 J

Explanation:

W=F x s

= 75 x 15

=1125

Answer Link

Otras preguntas

An apple orchard sells apples in bag of 10. The orchard sold a total of 2,430 apples one day. How many bags of apples was this?
Multiplying a number by 2 and then dividing it by 3 is the same as multiplying by what number
Why is isopropanol miscible with cyclohexane?
Identify the equation that translates y=In(X) five units down 1.) Y=In(x-5) 2.)Y=In(x)+5 3.)Y=In(x+5) 4.)Y=In(x)-5
scientific observations: a. are limited to available equipment used to record a natural phenomenon. b. can be made by instrumentation c. can be made directly by
Which of the following is an example of kinetic energy? (2 points) Select one: a. chemical energy b. gravitational energy c. nuclear energy d. thermal energy
how would you simplify 9v-12v
what is the holocaust? what type of government was in Germany at the time of the holocaust?
The density of a mystery solid is 1.00 g/cm3. will this float or sink in pure water?
What are some characteristics of the ecosystem in which you live