logansgirl2620 logansgirl2620
  • 01-10-2017
  • Mathematics
contestada

A 20-foot cable hangs from the top of a building that is 50 feet high. if the cable weighs 2 pounds per foot, how much work is done in lifting up the entire cable to the top of the building?

Respuesta :

Dallascowboysmac Dallascowboysmac
  • 06-10-2017
20*2=40
40*50=2000
2000/60=33.33
about 33 hours by lifting by hand
Answer Link

Otras preguntas

not true of Eugene Debs?
1/2x^3 = 125/2 Help please (:
help me i forgot how to math
please help me!!!!!!!!!​
What is cardinality? Give an example of cardinality.
1. What is the difference between a veto and a line-item veto?
EXPLAIN why most earthquakes occur at the boundaries of different tectonic plates
Alison has 1/2 cup of yogurt for making yogurt for making fruit parfraits .Each parfrait requires 1/8 cup of yogurt. How many runners will be needed?
This problem requires putting together several concepts to calculate the tem- perature of the sunlit side of the Moon. The Moon absrorbs most of the sunlight fa
Some factory worker are using waste to create works of art. What do you think of this saying