eastboogie9279 eastboogie9279
  • 01-03-2018
  • Business
contestada

The fourth phase of the project life cycle involves ____ the project.

Respuesta :

MrsTriplet MrsTriplet
  • 11-03-2018
In project management there are four phases of the project life cycle. 
1) Initiation
2) Planning
3) Performing
4) Closing

The closing of the project involves finalizing all data collected, documenting and evaluating the project. This step is major in the phase because it is a reflection of the entire project and is usually turned into a superior.
Answer Link

Otras preguntas

Alcohol is a (1)____________, which means it (2)_________ the body.
Which of the following graphs best represents the solution to the pair of equations below? y = −2x + 2 y = 2x + 2 Group of answer choices: -A coordinate plane
Question 21 Which equation is a balanced chemical equation? A 2NaOH + CaBr2 + Ca(OH)2 + NaBr B NO + Cl2 → NOCI с CaCO3 + CaO + 2CO2 D 2AlCl3 + 3Mg + 3MgCl2 + 2A
ARST - AMNO, What is MN? R 20 O S N 35 (not drawn to scale) M A4 B 36 8 D 28
On average , Americans drink three cups of coffee each day. Americans spend about $2.00 for each cup of coffee. Most coffee drinkers drink coffee with breakfast
Please help im confused i was not here today.. Please reflect (-4,-3)??.​
Bx = -1.33 m and By = 2.81 m Find the magnitude of the vector.
PLEASE HELPP WILL MARK AS BRAINLIEST
How effective was desegregation bussing
Thanks my guy love y’all