pieman33333 pieman33333
  • 04-04-2018
  • Mathematics
contestada

Three workers can do a job in 28 hours. How many more workers are needed to do this job in 12 hours?

Respuesta :

MrRamon
MrRamon MrRamon
  • 13-04-2018
4 additional workers for 7 total workers.
if it takes 3 workers 28 hours to do work there are 84 total hours of work (3*28=84) to find how many workers it will take to get the work done in 12 hours divide 84 by 12. 84/12= 7 total workers. 7-3= 4 additional workers needed.
Answer Link
pranilraichura
pranilraichura pranilraichura
  • 08-03-2020

Answer:

4 workers

Step-by-step explanation:

Answer Link

Otras preguntas

What are organ systems are made of
Second row second column solve for 6c
what is the product of the polynomials below? (x-9)(x+2)
what is the slope of the line with equation y=-5x
Express sinV as a fraction and as a decimal to the nearest hundredth
most immigrants came to America from what three European nations?
A person holding a 30 kg box 1 m above the floor puts it down. How much work was done ? Remember , the force of an objects weight = mass times gravity A. 0.0j
What transformation has changed the parent function f(x) = [tex]3(2)^{x} [/tex]  to its new appearance shown in the graph below? A. f(x) + 2 B. f(x) + 4 C. f(x
3t – 18t + 4 = -26 what is t? and explenation please Thanks!!!
"Find the tangent ratio of angle Θ. "