What action is often necessary when installing joists for a cantilever floor?

Respuesta :

idegollacion20
idegollacion20 idegollacion20
  • 14-04-2018
A cantilevered floor is a kind of floor that pops out past the foundation wall below.  Start the joist layout from the longest and strongest run the house or building has. You should also lay floor joists on the stairway's opposing side. Also, remember the 2/3 rule for framing cantilever joists. This means that twice the joist's length should remain inside the structure while the rest sticks out.
Answer Link

Otras preguntas

Does the health insurance system in the US affect the work of health scientists? Why or why not?
The Roth family has liquid assets of $10,000, use assets of $150,000 and investment assets of $34,000. They also have liabilities totaling $108,000. If their to
an atom will be neutral if a. electrons equal energy levels. b. protons equal neutrons. c. protons equal electrons.
What type of number best describes 0.9,which is 3.0?Explain
why don't north and south korea get along?
Most moths of a particular population died when the chestnut blight fungus that they were dependent on got wiped out. But some moths did survive. Which mechani
what is the inverse of h? h(x) = 6x 1
Samuel can type nearly 40 words per minute how many hours would take to type 2.5x10.5 words
solve the equation for b: b^-3= 1/64
If you want to indicate that you went to Costa Rica ten months "ago," you would indicate this by saying "hace diez meses que yo______a Costa Rica." (ir)